Zonge Engineering
Expanding the workshop facility onto the current hardstand involves the modification of existing footings along the boundary line, alongside adding a 450m² carpark.
-
Base Preparation
- Poured Slab for Shed
- Extended Driveway
- Concrete Patio
Gallery




